世纪森源

Qualified Contact Path

Book a Factory Audit or Technical Review

Move from passive evidence review into supplier qualification with an on-site visit, video audit, document session, or technical meeting.

Audit options

On-site factory visit

Best for final supplier screening, production workflow review, and direct workshop inspection.

EPC contractor / project owner

Video factory audit

Fastest route when teams need preliminary review before arranging international travel.

Distributor / overseas engineering team

Technical review meeting

Best when drawings, standards, FAT expectations, and integration scope need early alignment.

Engineering procurement team

Document review session

Focused review of compliance, workflow evidence, and project-facing documentation boundaries.

Consulting engineer / compliance reviewer

Who should book

EPC contractor
Project owner
Distributor
Consulting engineer

Preparation checklist

Prepare SLD, load schedule, target standards, delivery expectations, and FAT review points so the engineering conversation starts with project context instead of generic marketing talk.

  • Single-line diagram
  • Load schedule
  • Target standards
  • Delivery expectation
  • FAT expectations

Book Factory Audit

Use this form to push supplier qualification context into the technical RFQ path before the engineering review starts.

This structured request continues into the technical RFQ page so your engineering team can review supplier, audit, and document context together.

Book Factory Audit | Qualified Supplier Review | SJSY Power International