CENTURY SENYUAN

RFQ and Technical Document Hub

Technical Download Center

Document center for overseas electrical procurement, EPC RFQs, and project handover planning. Product PDFs are development placeholders; RFQ, FAT, export, and commissioning packages should be confirmed by the engineering team.

Engineering Document Packages

These entries help buyers prepare complete RFQs and project handover discussions. They do not claim public certificates, test reports, or client evidence.

Request engineering quote

RFQ Toolkit

Switchgear RFQ Checklist

Checklist for single line diagrams, load schedules, voltage level, feeder quantity, component preferences, metering, and installation conditions.

Purpose
Helps overseas buyers send complete low voltage switchgear and distribution cabinet RFQs.
Status
Request editable checklist from engineering desk
Request RFQ checklist

Quality Documents

FAT Document Package Structure

Reference structure for factory acceptance testing records, inspection checklists, wiring checks, and project-specific verification documents.

Purpose
Aligns buyer, factory, and site teams before shipment.
Status
Reserved for approved project-specific FAT records
Discuss FAT documents

Export Documents

Electrical Equipment Export Document Checklist

Reference checklist for packing list, commercial invoice, certificate of origin where applicable, datasheets, routine test reports, and shipping marks.

Purpose
Supports customs review and project handover planning for transformers, switchgear, and compact substations.
Status
Template scope depends on destination country and trade term
Request export checklist

EPC Documents

Overseas Installation and Commissioning Package

Document framework for site readiness, installation supervision, commissioning checks, training records, punch-list tracking, and handover confirmation.

Purpose
Clarifies EPC responsibilities before overseas technical support is scheduled.
Status
Reserved for confirmed EPC service scope
Request EPC document scope

Need a specific datasheet or project document?

Share the product model, destination country, project standard, and drawing requirements so the engineering team can confirm available document scope.

Request engineering quote